project of the month

Town tower

October 2017

The Köflach town tower was transported from the town hall to a roundabout and erected there prominently.

AIR SEPARATION

August 2017

Around 15 million euros were invested in a modern air separation plant. Prangl was involved in all important lifts.

Herrenstein

June 2017

Prangl has erected the largest wind power plants that are currently situated at an Alpine location in Austria. 

news

Survey

The trade magazine "Solid" asked: Who are the best suppliers for the construction industry and construction trades? 

videos

Moving pictures
We give our projects a face. Let us inspire you and get a visual impression of our daily work.

Magazine

In the latest issue of "up" you can find lots more interesting site reports, an interview with Gerold Rudle, a report about the Ferrari California

locations

Prangl europewide
Through our europewide branch network we are able to offer you short reaction times and a maximum of flexibility.
X